Pages

06 January, 2014

Progress

Just a quick update!

Here you see we have nailed railings on top of the grow beds. In this photo, you can see one of the pipes not yet installed.


A fuller view of the above photo.


We cut a hole in the side of the liner where the hole in the grow bed is. Then we attached the pipe fittings.


Here is Aaron tightening the fitting.


Attaching the first part of the pipe.


Here you can see that Aaron has just cut a hole in the liner and is now getting the fittings together to install them. Each grow bed has a hole at either end for water to flow in and out of.


Inside the shed you can see the 100 gallon tank we will use for fish. We have to do some calculations to determine how many pounds of fish we will use.


Here is Aaron inside the tank doing some adjustments to the hole toward the bottom of the tank where the water will flow out.

No comments:

Post a Comment